09/01
In 2006 work commenced on the second linkspan at Oban. The £2.75million contract, the first phase of which
was carried out by George Leslie Ltd of Barrhead, stopped during the main summer season and recommenced in the autumn.

In 2006 work commenced on the second linkspan at Oban. The £2.75million contract, the first phase of which
was carried out by George Leslie Ltd of Barrhead, stopped during the main summer season and recommenced in the autumn.